City & Project Relocation
When a reservoir, a mine or a major infrastructure project means a settlement or a facility has to move, the new place has to work from day one. We plan the relocation from new-site selection to the last utility connection.
What we do
- 01
New-site selection
Candidate sites for the new settlement or facility screened and ranked.
- 02
Layout
The new settlement or facility laid out with its public and technical functions.
- 03
Infrastructure
Roads, water, wastewater, power and communications for the new site.
- 04
Utility re-routing
Lines, pipes and roads that cross the affected area re-routed.
- 05
Phasing
A move plan that keeps people and operations running throughout.
- 06
Stakeholder material
Maps, 3D views and documents for authorities and the people affected.
Typical deliverables
- 01Relocation needs assessment
- 02New-site ranking
- 03Layout and master plan
- 04Infrastructure and utility plan
- 05Re-routing plan
- 06Phasing and move plan
- 07Stakeholder presentation set
Method
- 01
Assess
What has to move, and why.
- 02
Site
New sites screened and ranked.
- 03
Plan
Layout and infrastructure.
- 04
Re-route
Utilities and access moved.
- 05
Phase
Move planned step by step.
Engagement roles
Advisor
- Relocation strategy and options
- Due diligence of relocation plans
- Advice to authorities and owners
Technical Consultant
- New-site and master plan design
- Owner’s engineer for infrastructure
- Specifications and tender
Technical Partner
- Co-delivery with public bodies
- Interface management across utilities
- Phasing and move support
Computed on our platform
- Region screening
- Route & corridor
- Site hazards & soil
- Water & drainage
- Building design
- Verified reports
Bring a site, a load or a question.
Tell us what you are planning — a campus, a plant, a grid connection or a second opinion. The right engineers reply by email.
