Hard Test — New & Existing Plants
Before you build, buy or refinance: an independent stress test of a plant design, or of an operating plant’s performance and the assumptions behind it. The result is a verified report that says what holds, what does not and what it means.
What we do
- 01
Design hard test
A new plant’s design and energy case tested against independent calculation.
- 02
Operating plant hard test
An existing plant’s real performance tested against what was promised.
- 03
Assumption stress test
The assumptions that carry the business case pushed until they break.
- 04
Gap & risk list
What does not hold, ranked by its effect on energy, cost and risk.
- 05
Remedies
Practical corrections for the design or the operation.
- 06
Verified report
An independent, verified report for owners, buyers and lenders.
Typical deliverables
- 01Hard-test scope and basis
- 02Independent recalculation
- 03Assumption stress-test results
- 04Gap and risk register
- 05Remedy recommendations
- 06Verified hard-test report
Method
- 01
Scope
What is tested and against what.
- 02
Recompute
Key results recalculated independently.
- 03
Stress
Assumptions pushed to their limits.
- 04
Compare
Gaps found and ranked.
- 05
Verify
Report checked and issued.
Engagement roles
Advisor
- Pre-investment or pre-refinancing hard test
- Buyer’s technical due diligence
- Lender’s independent check
Technical Consultant
- Design review and recalculation
- Owner’s engineer on corrections
- Specification of remedies
Technical Partner
- Implementation of remedies
- Performance re-testing
- Operations optimisation
Computed on our platform
- Hard-test verification
- Report verification
- Yield engines
- Grid studies
- LCOE / NPV / IRR
- Standards lookup
Bring a site, a load or a question.
Tell us what you are planning — a campus, a plant, a grid connection or a second opinion. The right engineers reply by email.
