WHT Energy

Hydropower

Run-of-river and dam-based plants — civil works, electromechanical equipment and the lines that take the power out of the valley.

Scope

  1. 01

    Hydrology & feasibility

    Flow, head and energy studies.

  2. 02

    Civil works

    Weirs, dams, tunnels, penstocks and powerhouses.

  3. 03

    Electromechanical

    Turbines, generators and control systems.

  4. 04

    Transmission

    Overhead lines from remote valleys to the grid.

  5. 05

    Refurbishment

    Upgrades of existing plants.

  6. 06

    O&M

    Long-term operation and maintenance.

Where this work sits on the map
  • Hydropower
  • Hydropower · Adana, TürkiyeTwo hydropower plants · 85 MW + 145 MW
  • Hydropower · Adana, TürkiyeDam & hydropower plant · 320 MW
  • Hydropower · Erzurum, TürkiyeTwo hydropower plants · 17 MW + 24 MW
Open the project map →
More from WHT Energy